🚆
Rail Infrastructure

P2225 — Etihad Rail Sharjah Link

Conventional speed passenger service: rail track, underpass, bridge, road & utilities. New road construction and existing road upgrade.

🏢 Tristar Engineering 👤 Client: Etihad Rail
📐 Consultant: Jacobs
Civil 3DNavisworksBluebeamMicroStationRevitInfraworks
🌉
Bridge & Road

P2224 — Junction A1 Overbridge, Al Suyoh

Online bridge over rail track and offline bridge over Main Nizwa Road. Existing road upgrade and new road construction.

🏢 Tristar Engineering 👤 Client: Etihad Rail
📐 Consultant: Jacobs
Civil 3DSubassemblyNavisworksSynchro ProRevitInfraworks
🔄
Rail Junction

P2212 — Etihad Rail Stage 2, Junction B

Elevated roundabout and two bridges with road upgrade and new road construction. Full 4D simulation with Synchro Pro.

🏢 Tristar Engineering 👤 Client: Etihad Rail
📐 Consultant: Jacobs
Civil 3DSubassemblyInfraworksNavisworksSynchro ProBlender
🏗️
Earthworks

C0306 — Etihad Rail Stage 2 Corridor

Cut & fill, rail embankment preparation, lineside access, V-ditches, sand berm, and earth ditch construction.

🏢 Tristar Engineering 👤 Client: Etihad Rail
📐 Consultant: Jacobs
Civil 3DBluebeamInfraworks
🛣️
Road Upgrade

R1006 — Al Khawaneej Road & Mushrif Park Corridor

Upgrade of Al Khawaneej, Al Amardi, Mushrif Park corridor with 2 bridges on Emirates Road. Full 4D simulation.

🏢 Tristar Engineering 👤 Client: RTA
📐 Consultant: KEO International
Civil 3DSubassemblyNavisworksSynchro ProRevitBlender
✈️
Airport Mega-Project

AMIA-220 Phase 1 — Enabling Works

Concourse 1, West Terminal Building, GSE Tunnels, BHS Road Tunnel, APM Tunnel, electrical utilities. Full BIM + Laser Scan + 4D/5D + VR.

🏢 Tristar Engineering 👤 Client: DAEP
📐 Consultant: Dar Al-Handasah
RevitCivil 3DNavisworksReCapCycloneLeica RTSSynchro ProUnreal Engine
🏢
Airport Expansion

Al Maktoum International Airport (AMIA)

Passenger terminal expansion: land & airside external works, car parking, roads, car shades, traffic signals, street lights, dry utilities.

🏢 Al Naboodah Contracting 👤 Client: DAEP
📐 Consultant: Dar Al-Handasah
RevitCivil 3DSubassembly3Ds MaxNavisworksSynchro ProInfraworks
🏛️
Iconic Architecture

Museum of the Future

One of the world's most complex structures. BIM modeling, coordination, and field verification using Trimble Robotic Total Station.

🏢 Trans Gulf Electro-Mechanical 👤 Client: Dubai Future Foundation
📐 Consultant: Buro Happold
RevitNavisworksAutodesk 360 GlueTrimble RTS
🛒
Commercial

Mirdif City Center

Car parking extension and masjid construction. MEP coordination with scan-to-BIM verification.

🏢 Trans Gulf Electro-Mechanical 👤 Client: Majid Al Futtaim
📐 Consultant: Mott MacDonald
RevitNavisworksBluebeamTrimble RTSSynchro ProReCap
🏨
Mixed-Use Residential

Mankhool Mixed-Use Building Complex

Four buildings (10–27 floors), three basement levels. Residential, commercial, and hotel apartments. MEP coordination and field layout.

🏢 Trans Gulf Electro-Mechanical 👤 Client: AW Rostamani
📐 Consultant: Arif & Bintoak
RevitNavisworksBluebeamTrimble RTS
🌊
External Works

Dubai Creek Harbour Sales Center

Access road and external works for the Dubai Creek Harbour Sales Center building. Infrastructure BIM and coordination.

🏢 Trans Gulf Electro-Mechanical 👤 Client: EMAAR Properties
📐 Consultant: ARCADIS
RevitNavisworksInfraworksBluebeam